0.1毫米,端面間隙沿圓周上的不同心度允差為0.1毫米,端面間隙沿圓周的不均勻允差0.3毫米(連接進出水管路后再分別校核一遍,仍符合上述要求)

    6、在檢查電機轉(zhuǎn)向與水泵的轉(zhuǎn)向一致后,裝上聯(lián)軸器的聯(lián)接柱銷;

    7、不要把泵本身作為管路支撐點,管路應(yīng)在泵的附近設(shè)可靠支撐。

    以上為不帶底座的水泵機組的安裝方法。

    對于配帶公共底座的泵,基礎(chǔ)與底座之間保留45毫米的間隙,用調(diào)整螺釘精確地調(diào)整機組并在聯(lián)軸器處對中。其安裝原則與不帶公共底座的機組相同。

五、起動、停止和運行

    1、起動:

    1)、起動前的檢查:

    a).泵或底座是否與基礎(chǔ)緊固;

    b).聯(lián)軸器與泵機組是否校正;

    c).管路是否按要求連接;

    d).手是否能容易地轉(zhuǎn)動轉(zhuǎn)子;

    e).是否所有軸承都有良好的潤滑。

    2)、起動前關(guān)閉出口閥,用介質(zhì)灌注排盡泵和管路內(nèi)的空氣。吸入狀況時,用泵體上部的螺塞排氣。在倒灌時泵也須排空;

2運行:

   1)、當壓力表壓力升高,慢慢打開出口閥;

   2)、打開所有輔助管路,并檢查流量;

   3)、泵是填料密封運行時,填料還處允許有多少量,滴水,輕輕壓緊填料壓蓋至少量滴水。

4)、為防止介質(zhì)升溫,泵不能在出口閥門

    5. After the concret solidifed, again correct the coaxial degree in the excircle of the two couplings, the error of the correction is not more than O.1 mm, the allowable error of the inhomo-geneous degree of the endface clearance along the circle is 0.3mm,  Re- inspect the correct pricision after tightening the foot unts,  finally, pour concret fuly nuder the foot of the pump and the motor except the around of the wedge shaped cushion.

    6. After check the rotary direction of the motor which is now in keeping with that of the pump,  you can install the connecting parallel pin of the coupling.

    7. The inlet pipe and outlet pipe should be supported by a brasket instead of the pump casing.

    Above all the mentioned methods and requirements are suitable for the pump set without common bedplate.

    Samely,  for the pump set with common bedplate. Fit the pre -assembled set with foun-dation bolts loosely inserted in the cut- outs in the foundation and align. There must be a 4-5cm gap between the top of the foundation and the bottom of the baseframe. Precisely align the set using the adjusting screws and check alignment on the coupling. Others you can refer to the above mention methods.

V. STARTING, STOPPING ADN RUNNING

     1. Starting:

     1 ). Before starting up the pump make sure that the following requirements have  been checked and fulfilled.

     a). Has the pump been firmly bolted to the base/foundation?

     b) . Have the coupling and pump unit been aligned as specified?

     c). Are the pipes properly fitted?

     d) . Can the unit be easily rotated by hand at the coupling? (Carry out at least one full rotation)

     e). Has lubrication been provided for oil-lubricated bearings?

     2)Before the pump is started up, it and the pipes must be vented and filled with the liquid to be pumped. In the case of both gravity feed and suction operation venting must be carried out via the hole on the upper suction elbow. In the case of suction operation the upum must