14、拆下密封體、軸套;

    15、用橡膠榔頭輕輕敲擊葉輪輪轂將葉輪從軸上退出:

    16、拆下另一端軸套、密封體,拆下聯(lián)軸器,拆下軸承體:

    17、松開彈性擋圈,退出深溝軸承。

    裝配順序按拆卸順序相反進行,但必須注意:

    1、安裝轉(zhuǎn)子時必須將軸放穩(wěn),所有的配合螺紋和間隙配合處都必須清洗并涂上裝配粘合劑:

    2、裝帶有間隙配合的葉輪時,應注意葉輪的轉(zhuǎn)向:

    3、深溝軸承須加熱后裝上軸(軸套)

    4、為補嘗泵軸與軸上零件之間由于熱膨脹產(chǎn)生的誤差,在用圓螺母和彈性墊圈壓緊轉(zhuǎn)子時須將彈性墊圈壓至極限點,然后旋轉(zhuǎn)180°松開圓螺母。

四、安裝

    1、檢查水泵和電機應無損壞;

    2、混凝土基礎(chǔ)應牢固,表面光滑平整:

    3、把地腳螺栓插入底座上的螺孔,把泵放在基礎(chǔ)上,用水平儀在軸端或出口端調(diào)整水平,在泵腳和基礎(chǔ)靠近地腳螺栓處必須墊墊塊:

    4、泵調(diào)整好水平后,給地腳螺栓灌漿,堅固后均勻地擰緊地腳螺栓,并重新調(diào)整水平,然后給底腳灌漿:

    5、校正電機與水泵軸的同心度,使兩軸成一直線,兩聯(lián)軸器外圓上的不同心度允差為

    10. Undo and twist off the grooved nut.

    11. Remove the deep groove ball bearing with bush from the shaft.

    12. Remove bearing cover.

    13. Remove block water ring from shaft -protecting sleeve;

    14. Remove shaft seal housing;

    Pull off shaft protecting sleeve;

    15. The impeller located with sliding fit on the shaff and can normally be removed easily. In ease of difficulty,  it can be loosened by gently tapping with a plastic hammer;

    16. Remove second shaft protection sleeve complete with the shaft seal housing,  if fitted. Remove coupling half and pull off deep groove ball bearing;

    17. Pull off bearing housing. Remove eirelip and pull off deep groove ball bearing.

    Reassembly is effeeted in reverse order to; disassemlly, but must give your attention to:

    1. For assembling the rotor,  position the pump shaft securely. All fits, threads and sliding fits of the shaft must be cleaned and coated with assembly paste;

    2. Mount the impeller, which has a sliding fit. When fitting the impeller,  observe the direction of rotation;

    3. Heat the deep groove ball bearing and fit it onto the shaft (sleeve) ;

    4. For compensate differences in thermal expansion between pump shaft and the components fitted on it. Tension the rotor parts elastically with groove nut and disc spring. For this purpose tension the disc spring to blocking point and then undo the grooved nut again by half a turn 180°.

Ⅳ. Installation

    1. Check whether the pump and the motor are in good condition;

    2. The concrete foundation must have been set hard and the surface must be smooth and flat;

    3. Loosely insert the foundation bolts in the baseplate. Position the pump set on the pump set on the foundation and align using a spirit level placed on the shaft or discharge nozzle. Shims must always be fitted to the left and right of the foundation bolts in close proximity to the bolts,  between the baseplate or foundation frame and the foundation itself.

    4. After alignment, grout in the foundation bolts using cement |nortar. When the mortar has been set hard, uniformly tighten up the bolts and

亚洲av无码国产综合专区,色翁荡息又大又硬又粗又爽,精品国产SM捆绑最大网免费站,精品亚洲成在人线av无码 青铜峡市| 波密县| 吴堡县| 英吉沙县| 卓尼县| 桃源县| 牙克石市| 荣昌县| 沐川县| 白山市| 漳平市| 南昌县| 河南省| 绥芬河市| 宜城市| 四川省| 固安县| 泸溪县| 稻城县| 东城区| 理塘县| 申扎县| 马公市| 洞头县| 屏南县| 福建省| 淮安市| 武平县| 肃南| 漾濞| 常德市| 东丽区| 周至县| 壶关县| 临沧市| 临猗县| 石泉县| 北碚区| 陆丰市| 吴川市| 岢岚县|