十一、拆卸與裝配

    拆卸:

    1、關(guān)閉出口閥,打開放水塞和排氣塞以排空水泵中的水;

    2、拆除泵上所有輔助管路;

    3、拆除聯(lián)軸器防護(hù)罩;

    4、松開并拆下密封蓋;

    5、松開法蘭螺釘,用起蓋螺釘將泵體和泵蓋分開,用起重機(jī)吊起泵蓋;

    6、軸承為稀油潤(rùn)滑的,放掉稀油;

    7、拆下軸承體和軸承托架之間的連接螺栓,松開非驅(qū)動(dòng)端軸承蓋螺母和連接螺栓;

    8、將軸承體退出凹槽,并將轉(zhuǎn)子吊出泵體,平放在安全的地方進(jìn)一步拆卸;

    9、拆下非驅(qū)動(dòng)端軸承的軸承體;

    10、松開并拆下圓螺母;

    11、從軸上拆下深溝軸承、軸套;

    12、拆下軸承蓋;

    13、從軸套上拆下?lián)跛Γ?span lang=EN-US>

    14、拆下密封體、軸套;

    15、用橡膠榔頭輕輕敲擊葉輪輪轂將葉輪從軸上退出;

    16、拆下另一端軸套、密封體,拆下聯(lián)軸器,拆下軸承體;

    17、松開彈性擋圈,退出深溝軸承。

    裝配順序按拆卸順序相反進(jìn)行,但必須注意:

    1、安裝轉(zhuǎn)子時(shí)必須將軸放穩(wěn),所有的配合螺紋和間隙配合處都必須清洗并涂上裝配粘合劑;

    2、裝帶有間隙配合的葉輪時(shí),應(yīng)注意葉輪的轉(zhuǎn)向;

    3、深溝軸承須加熱后裝上軸(軸套)

    4、為補(bǔ)嘗泵軸與軸上零件之間由于熱膨脹產(chǎn)

Ⅺ. Assembly and Disassembly

    1. Close the suction and delivery gate valves and drain the pump by opening the drain plug;

    2. Remove any pipes between additional equipment and the pump;

    3. Remove coupling guard;

    4. Loosen and push back the seal cover;

    5. Undo flange screws and release the upper casing half from the lower casing half with the aid of the forcing screws, remove with lifting gear and store in a safe place.

    6. In case of oil- lubricated pumps,  drain off the oil;

    7. Remove the screw connection between bearing housing and bearing brackets. Also undo the nuts and bolts which secure the bearing cover;

    8. Press the bearing housing out of the recesses and lift the rotor upwards out of the lower casing half. For further disassembly,  place securely in horizontal positon.

    9. Pull off the bearing housing of the fixed bearing(opposite the drive end).

    10. Undo and twist off the grooved nut.

    11. Remove the deep groove ball bearing with bush from the shaft.

    12. Remove bearing cover.

    13. Remove block water ring from shaft-protecting sleeve;

    14. Remove shaft seal housing;

    Pull off shaft protecting sleeve;

    15. The impeller located with sliding fit on the shaft and can normally be removed easily. In case of difficulty,  it can be loosened by gently tapping with a plastic hammer;

    16. Remove second shaft protection sleeve complete with the shaft seal housing,  if fitted. Remove couping half and pull off deep groove ball bearing;

    17. Pull off bearing housing. Remove circlip and pull off deep groove ball bearing.

    Reassembly is effected in reverse order to; dismantling, but must give your attention to:

    1. For assembling the rotor,  position the pump shaft securely. All fits, threads and sliding fits of the shaft must be cleaned and coated with assembly paste;

    2. Mount the impeller,  which has a sliding fit. When fitting the impeller, observe the direc-

亚洲av无码国产综合专区,色翁荡息又大又硬又粗又爽,精品国产SM捆绑最大网免费站,精品亚洲成在人线av无码 方城县| 芒康县| 宁南县| 田林县| 漳平市| 阳原县| 珠海市| 库尔勒市| 永德县| 马龙县| 苍溪县| 拉萨市| 娄底市| 客服| 琼结县| 科技| 肇东市| 三门县| 乐陵市| 长葛市| 固始县| 烟台市| 云和县| 长白| 稻城县| 怀化市| 曲松县| 衢州市| 怀柔区| 临颍县| 林芝县| 九江县| 平凉市| 新密市| 兴业县| 安顺市| 宜春市| 噶尔县| 工布江达县| 宜兴市| 敖汉旗|