合后(逆時(shí)針方向),裝上聯(lián)軸器的聯(lián)接柱銷:

    4、進(jìn)出水管路應(yīng)另設(shè)支撐,不得藉泵體支撐;

    5、水泵與管路之間的結(jié)合面應(yīng)保證良好的氣密性,尤其是進(jìn)水管路必須保證嚴(yán)格的不漏氣,并且在裝置上無窩存空氣的可能;

    6、如水泵裝置在進(jìn)水水位以上時(shí),為了灌泵起動(dòng),一般可裝底閥,也可采用真空引水方法;

    7、水泵與出水管路之間一般需裝閘閥和止回閥(揚(yáng)程小于20米的可不用)。止回閥裝在閘閥后面。

    以上所述的安裝方法是指不帶公共底座的水泵機(jī)組。

    對配帶公共底座的泵機(jī)組的安裝,只要調(diào)整底座與混凝土基礎(chǔ)之間的楔形墊鐵來校正泵機(jī)組的水平,然后在其間灌注混凝土。其安裝原則與要求和不配帶公共底座的泵機(jī)組安裝相同。

五、起動(dòng)、停止和運(yùn)行

  1、起動(dòng)與停止:

  (1)、起動(dòng)前,轉(zhuǎn)動(dòng)泵機(jī)組轉(zhuǎn)子應(yīng)該輕滑均勻;

  (2)關(guān)出水閘閥,灌泵(如無底閥則用真空泵抽空氣引水),要保證泵內(nèi)充滿水,無空氣窩存;

  (3)、如果泵上裝有真空表或壓力表,要關(guān)閉其與泵連接管路上的旋塞再起動(dòng)電動(dòng)機(jī),待轉(zhuǎn)速正常后再打開,然后逐漸打開出水閘閥.如流量過大,可以適當(dāng)?shù)仃P(guān)閉閘

the pump shaft and the motor shaft by means of adjusting the wedge- shaped cushion,  then fully pour the concret into all the foot bolt holes.

  (2) After the eoncret solidifed, again correct the coaxial degree in the excircle of the two couplings, the error of the correction shoud be  not  more that O.1mm,  the allowable error of the inhomogeneous degree of the endface clearance along the circle is O.3ram, Re - inspect the correct prieision after tightening the foot nuts, finally, pour concret fully under the foot of the pump and the motor except the around

of the wedge shaped cushion.

  (3)  After checking the rotary direction of the motor which is now in keeping with that of the pump, you can install the connecting parallel pin of the coupling.

   4. The inlet pipe and outlet pipe should be supported by a brasket instead of the pump easing.

   5. The combination between the pump and the pipe must be keeping good sealing,  especially no leakage of air occures from the inlet pipe and no possible remained air in it in the cause of installation.

   6. If the pump is installed above the suction wate level,  it should be equipped foot valve for pouring ware and driving and it also can suck water by suction vacuunl.

   Above all the mentioned methods and requirements are suitable for the pump set without common bedplate; samely, for the pump set with common bedplate, you also cau refer to the above mention methods.

V. Starting stopping and running

   a. Starting and stopping:

   1. Before starting,  turn the rotor,  it should be flexible.

   2. Close the discharge valve, pour wate in it (if no foot valve, draw water inside with a vacuum pump).Be sure the pump is full of water and no air remained in it.

   3. If there is a vacuum gauge installed on the