5、水泵與管路之間的結(jié)合面應保證良好的氣密性,尤其是進水管路必須保證嚴格的不漏氣,并且在裝置上無窩存空氣的可能;

    6、如水泵安裝在進水水位以上時,為了灌泵起動,一般可裝底閥,也可采用真空引水方法;

    7、水泵與出水管路之間一般需裝閘閥和止回閥(揚程小于20米的可不用)。止回閥裝在閘閥后面。

    以上所述的安裝方法是指不帶公共底座的水泵機組。

    對配帶公共底座的泵機組的安裝,只要調(diào)整底座與混凝土基礎之間的楔形墊鐵來校正泵機組的水平,然后于其間灌注混凝土。其安裝原則與要求和不配帶公共底座的泵機組安裝相同。

五、起動、停止和運行

  1、起動與停止:

  (1)、起動前,轉(zhuǎn)動泵機組轉(zhuǎn)子應該輕滑均勻;

  (2)關(guān)閉出水閘閥,灌泵(如無底閥則用真空泵抽空氣引水),要保證泵內(nèi)充滿水,無空氣窩存;

  (3)、如果泵上裝有真空表或壓力表,要關(guān)閉其與泵連接管路上的旋塞再起動電動機,待轉(zhuǎn)速正常后再打開;然后逐漸打開出水閘閥,如流量過大,可以適當?shù)仃P(guān)閉閘閥進行調(diào)節(jié),盡量使泵運行工況接近泵的設計點。

  (4)、均勻地擰緊填料壓蓋上的壓緊螺母,使液體呈滴狀流出,同時注意填料腔處

  (2) After the concret solidifed, again correct the coaxial degree in the excircle of the two couplings, the error of the correction is not more that 0.1mm, the allowable error of the inhomogeneous degree of the endface clearance along the circle is 0.3ram, Re -inspect the correct pricision after tightening the foot nuts, finally, pour concret fully under the foot of the pump and the motor except the around of the wedge shaped cushion.

  (3)After check the rotary direction of the motor which is now in keeping with that of the pump,  you can install the connecting parallel pin of the coupling.

   4. The inlet pipe and outlet pipe should be supported by a brasket instead of the pump casing.

   5. The combination between the pump and the pipe must be keeping good sealing,  especially no leakage of air occures from the inlet pipe and no possible remained air. in it in the cause of installation.

   6. If the pump is installed above the suction wate level, it should be equiped foot valve for pouring ware and driving and it also can suck water by suction

vacuum.

   Above all the mentioned methods and requirements are suitable for the pump set without common bedplate;  samely,  for the pump set with common bedplate,  you also can refer to the above mention methods.

Starting Stopping and Operation

   Starting and stopping:

   1. Before starting, turning the rotor, it should be flexible.

   2. Close the discharge valve, pour water in it (if no foot valve, with a vacuum pump for drawing water instead) . Be sure the pump full of water and no air remained in it.

   3. If there is a vacuum gauge installed on the  pump,  the cocks on the pipe passage way which connect the pump should be turned off. Then start the motor. It is not allowed to turn ou the motor until the